AGP Terminal 2
PNW Coastal Freight Corridor
Terminal 2 operates as a bulk loading facility. The Port, in conjunction with Ag Processing Inc., a grower owned cooperative in the Midwest, developed the new state-of-the-art terminal.
Using the latest technology, the facility includes enclosed conveyers that transport product from the receiving building through a sampler and inline scales into the vessel.
In addition to direct rail car to ship loading, AGP Terminal 2 offers dockside storage for 64,000 metric tons of product for export to vessel, preserving product integrity.
- Deepwater berth -41 feet (-12.5 meters) MLLW
- 600 feet long (183 meters)
- Apron width 100 feet (30.5 meters)
- 75 acres (30 hectares) paved, secured cargo yard and near dock warehousing
- Foreign Trade Zone #173
AGP Terminal 2 Rates
Ship costs for vessels calling Port of Grays Harbor Terminal No. 2 to load dry bulk commodities at the loading facility are estimated in the table to the right.
All charges listed are estimates and subject to change without notice. Please contact service providers for current charges.
| Port of Grays Harbor fees: | ||
|---|---|---|
| Pilotage services - inward/outward | $ 13,454.00 | |
| Tug assist services - inward/outward | $ 12,360.00 | Not incl. fuel surcharge |
| Dockage | Based on GRT | Please see Tariff No. 1 |
| Terminal security charges | $ 630.00 | per 24 hour period |
| Cement Hatch Attachment See Subrule 610 of Port Terminal Tariff No. 1 |
Varies | |
| Ship agency and other fees: | ||
| U.S. Customs fees | $ 3,900.00 | |
| Lines - tie up/let go | $ 3,300.00 | |
| Agency fees | $ 3,500.00 | 1st five days |
| Agency expenses | $ 2,250.00 | |
| Harbor dues | $ 650.00 | |
| Vessel monitoring/security | $ 600.00 | |
| USDA / Ncb Inspections | $ 2,000.00 | |
Download the AGP Terminal 2 fee schedule.
Terminals Index
Terminals Info
Terminal 4
Terminal 3
Terminal 2 AGP
Terminal 2 Liquid Bulk
Terminal 1
Transportation
Tariffs & Services
